Transformation capacity is a measure that expresses the effectiveness and efficiency of altering the functional and physical characteristics of a building or its parts to meet changing needs and requirements.
At building level, transformation capacity reflects both technical and spatial aspects determining, for example, the feasibility and impact of functional building re-conversions. At assembly level, transformation capacity expresses the effectiveness and efficiency of reconfiguring to meet new performance standards.
[edit] Guidelines
Both reuse potential and transformation capacity are measures of the reversibility of a building. Transformation capacity is nevertheless put forward as sub-function of reuse potential; if an assembly can be transformed more easily, its reuse potential is higher too.
At this moment, the implementation of the concept ‘reuse potential’ is under development. Therefore, the proposed definition will be detailed during the project.
[edit] Related terms
The Transformation Capacity Tool assesses the transformation capacity of buildings and building parts, and classifies them as having a high, medium and low transformation capacity.
[edit] References
Debacker W. and Manshoven S. (2016) Synthesis of the state-of-the-art BAMB report: Key barriers and opportunities for Materials Passports and Reversible Building Design in the current system. VITO.
Durmisevic E. (2006). Transformable building structures: design for disassembly as a way to introduce sustainable engineering to building design and construction (doctoral thesis). TUDelft.
--BAMB - Buildings As Material Banks 08:02, 15 Aug 2018 (BST)
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.